Marine

Restoration / Docks / Water Taxi Pavillion

Original Fish Camp

Rendering / Completed

Pre-Engineered Frame Water Taxi Shelter

New Zeke's Landing Water Taxi Shelter

Exposed Rafters Water Taxi Shelter

126 feet long Single Span Girder

300 Ton Crane - Set in Place

Bridge end setions sit on (4) 30" helical piles

Foundation and Wall Stabilization Adjacent to New Marina Construction

Submerged Dock - destroyed

Micro Grate Decking

Main Dock Renovated

View from Tee Head at Completed Reconstruction of dock system

Floating Docks

Floating Docks

Floating Docks

Floating Docks
Industrial

Chemical Resistant Epoxy Floors

Chemical Resistant Epoxy Floors

New 1400 amps of power at line production area

5 Truck Loads of Equipment Heavy Rigging

40,000 lbs. Heavy Equipment

Starting move-in for Re-tooling Moving with Air Ride Curtains

Manufacturing Line

Manufacturing Line

Manufacturing Line

Manufacturing Line

3 in series - Emergency Generators

Chilled Water Storage 2,000,000 gallon storage

Storm storage located beneath parking lot of retail center.

Ludlum Devices Radio Active / Nuclear Waste Detection

Emergency Generator

Emergency Generator

Sheet Piling and Welded Fabric Liner

Void filled with No. 57 stone 6,000psi concrete cap
360 Cypress Drive, Suite 4 Tequesta, FL 33469
200 Butler Street, Suite 207 West Palm Beach, FL 33407
Phone: 561.262.6876
Providing General Contractor and Construction Management Services to all of Palm Beach County and South Florida